Greenroofs — The Process

The site is first completely water proofed and is sloped towards the drainage points. Drainage cells (30 mm thickness in this case) are laid out in an interlocking format. For heavy rooting plants we use a root guard.

The Geo textile filter fabric (350 GSM in this case) is laid out. Medium is filled in. (In this case it was coco peat/ red soil/ Dried Farm manure)

The planting stock is then planted as per the design and layout.